Public Meeting, Request for Determination of Applicability
It is proposed to replace approximately 1,320 feet of an existing gas main along the east side of Main Street and the north side of Lake Street. This section of existing gas main is aging and has reached the end of its useful service life. BGC is proposing to cap the existing gas main, abandon it in place, and install a new gas main adjacent to the existing line, within the existing paved roadways.