On Monday. March 23, 2020 at 7:50 p.m. a public hearing will be held in the Select Board Meeting Room on the 2nd Floor of Winchester Town Hall in the Town of Winchester upon the petition of NSTAR Electric d/b/a Eversource Energy for permission to construct, and a location for, a line of conduits and manholes, with the necessary wires and cables therein, for the transmission of electricity, under the following public ways of said Town: Petition requests that Town of Winchester by order issue a modified GOL approving the amended pages that detail the realignment for the new electric transmission line within public ways on Bacon Street, Winchester. This work is necessary to construct a new 7.7 mile 115-kilovolt (“kV”) underground transmission line in Woburn, Winchester, Medford, Somerville, Everett, and Boston and to modify the Woburn Substation and Mystic Substation.